The procedure to add a new rent charge element to an asset is as follows:
1.
).
2. The Source field is automatically populated with the origin of the element e.g. Manual Update, Data Import, Rent Increase, etc.
3. The Actual Value (i.e. the amount to be charged at the selected frequency) will be calculated automatically using the associated rent cap.
), or type in the value directly (format DD/MM/YY or DD/MM/YYYY) i.e. the date on which a review of the charge value was last conducted.
), or type in the value directly (format DD/MM/YY or DD/MM/YYYY) i.e. the date on which the next review is scheduled for this element charge.
4. The new record is displayed in the Elements summary table.
5. The Total Base Value and Total Actual Value fields reflect the additional charge component.
Note
1 The search facility will return all possible matches for any corresponding address field once the Number of characters before an automatic search commences system preference is reached.
2 Adjustment charge elements are excluded from the selection list.
3 The Base Value is the latest calculated rent charge element prior to a cap being applied, and will be inactive for charge elements configured as points based.
4 The Updated By and Updated Date fields are automatically populated with the name of the end user adding the element charge and current system date respectively.
5 To amend the details of an existing asset charge element, double-click on the desired row in the Elements summary table and repeat steps 10 through 14; only a limited number of fields can be updated once a record has been created.
See related topics...
Rents setting management overview
To create a new rent charge for an asset
To clone a rent charge for an asset