The procedure to add completed work to an asset record is as follows:
- Using the global search facility, type in the first few characters of the asset address
1.
- With the results displayed in the Asset tab, double-click on the row containing the exact record match. Where the expected record is not listed, a more advanced search can be conducted using the spy-glass icon (
).
- Click on Asset Details. The Asset Details window is displayed for the current asset.
- Click on Planned and Completed Work
1. The Planned and Completed Work tab is activated.
- Click on Add Completed Work. The Planned and Completed Work Details window is displayed.
- Using the Component and Replacement drop-down fields, select the inter-related parameter values to pinpoint the completed fixture or fitting upgrade.
- Using the Survey replacement drop-down field, select the matching item identified through the stock condition assessment.
- Using the Work type drop-down field, select the matching classification applicable to the completed fixture or fitting upgrade e.g. Regeneration, Energy Efficiency, etc.
- Enter the original Planned date for the replacement work using the calendar icon (
), or type in the value directly (format DD/MM/YY or DD/MM/YYYY).
- Enter the Actual cost of the completed work into the field provided. The Up and Down arrows are available to increment or decrement the value, as required.
- Enter the Quantity of items replaced through the completed work instruction.
- Using the Planned work project and Planned work label drop-down fields, select the specific project name and analysis category applicable to this completed work instruction.
- Enter the Completed date for the replacement work using the calendar icon (
), or type in the value directly (format DD/MM/YY or DD/MM/YYYY); the adjacent Completed by field automatically reflects the name of the current system user.
- Enter the unique Job number for the completed work into the field provided i.e. the unique reference assigned to the work instruction.
- Using the Contractor drop-down field, select the name of the contractor that fulfilled the work instruction.
- Using the VAT rate drop-down field, select the VAT percentage applicable to the cost of the completed work.
- Where the cost of the completed work is to be met by a third party, activate the Rechargeable tick box provided.
- Choose an Effective from date for this completed work record i.e. the date on which it came into effect
2.
- Choose an Effective to date if the completed work record is to be time bound; a blank field means it will be continually valid.
- Click on Save. A new entry is displayed in the Completed Work data grid.
Tip
1 Use the Left (
) and Right (
) scrolling arrows to reveal additional tabs that might be hidden from view.
Note
1 The search facility will return all possible matches for any corresponding address field once the Number of characters before an automatic search commences system preference is reached.
2 The Effective from date defaults to the current system date and cannot be left blank.