The procedure to view the calculated service charges for asset records is as follows:
Tip
1 By default, all results are displayed alphabetically, by 'asset address'; to aid in identification and analysis, rows can be reordered by clicking on any of the available headings.
Note
1 The Search Calculations field will match against any element of the calculation scenario description.
2 For Import and Manual calculation methods, only the selection of a Rent charge type is applicable.
3 A subset of fields are visible by default; additional fields pertinent to the calculation type can be revealed or hidden via the Menu option.
Field |
Description |
Calculation Type |
Asset |
The address of the asset included in the calculation scenario. |
All calculation types |
Base total charge |
The current charge for the asset record, including any brought forward balance from the previous period. |
Estimate or Adjustment |
Proposed basic charge |
The proposed estimated or adjusted charge for this period (excluding any brought forward balance), derived through the calculation scenario. |
Estimate or Adjustment |
Proposed B/F balancing charge |
The proposed surplus or deficit balance brought forward from the previous period. |
All calculation types |
Proposed total charge |
The summation of the Proposed basic charge and Proposed B/F balancing charge figures used to calculate the estimated or adjusted results for this period. |
Estimate or Adjustment |
% Increase |
The percentage by which the current total charge has increased as a result of the calculation. |
Estimate or Adjustment |
Estimated charge |
The baseline projection figure used to calculate the final result. |
Actual |
Total estimated charge |
The summation of the B/F balancing charge and Estimated charge figures used to calculate the final result. |
Actual |
Proposed actual charge |
The projected final charge, derived through the calculation scenario, excluding any balance brought forward from the previous period. |
Actual |
Proposed total actual charge |
The projected final charge, derived through the calculation scenario, including any balance brought forward from the previous period. |
Actual |
Balancing charge to C/F |
The final combined charge to be carried forward into a future scenario, applicable only in the instance where an estimated calculation is used as a baseline projection. |
Actual |
See related topics...
Service charge results management overview
To cascade calculated service charge cost elements to asset records
To modify the calculated service charge cost elements of an asset record